F24/24SE Provisional Mast Crane (A-Frame)

Three lifting straps connected in one single lifting point; Possible craning with the stepped mast because lifted boat will tilt slightly forward; Safety dyneema around the mast; Certified lifting equipment
SKU
FIRST24SE_M51
Qty
Out of Stock